Dominion Theatre, London – Grid Remodelling
MJC led the remodelling of the stage grid at the Grade II-listed Dominion Theatre, a major upgrade designed to increase technical capacity and production flexibility.
- Sector
- Theatre
- Status
- Delivered
— Mike Jackson
“We were trusted with every aspect of this upgrade - structure, theatre systems, and services - and had just 14 weeks to deliver it all. The new grid gives the Dominion the kind of flexibility today’s productions demand, without compromising its listed heritage.”
Existing venue fabric, production loads and limited downtime.
Structural Engineer
Structural details, checks and site evidence for the project team.
What the brief was — and what we delivered.
MJC led the remodelling of the stage grid at the Grade II-listed Dominion Theatre, a major upgrade designed to increase technical capacity and production flexibility.
Brief
The existing grid limited the scale and variety of productions the theatre could host. The project required a modern, high-capacity system capable of supporting larger rigging loads and more flexible staging configurations.
MJC's scope
- Structural design and delivery of the new grid system.
- Integration of a new loft block flying system.
- Coordination of mechanical and electrical services.
- Architectural input and theatre consultancy.
- On-site presence throughout construction.
Programme and outcome
MJC oversaw the wider delivery across a tight 14-week on-site programme. The result is a significantly upgraded stage house that gives the Dominion greater flexibility while respecting its listed heritage.
The work, on site.

More from theatre projects.
Structural Support That Performs On Stage and On Site
From listed theatres and concert halls to airport concessions and live venues, we bring practical structural engineering to complex environments. Whether you're planning a refurbishment, fitting out a retail unit, or navigating venue constraints, we'll help you make it buildable - and make it happen.