Case study

J2 Festival

The J2 Festival in London, known for its annual extravaganza of music and arts, celebrated another successful edition this year, thanks to the expertise of engineering consulting firm MJ Consulting (MJC).

Discover more

 

The J2 Festival in London, known for its annual extravaganza of music and arts, celebrated another successful edition this year, thanks to the expertise of engineering consulting firm MJ Consulting (MJC). With a reputation for delivering top-notch structural design and analysis solutions, MJC was enlisted to guarantee the safety and stability of the festival’s temporary stage structures.

 

The comprehensive scope of work included:

MJC began by meticulously reviewing the structural designs of the festival’s five proposed stages. Their aim was to guarantee compliance with Health & Safety and performance standards.

A crucial step in the project involved load assessments for each stage. This assessment considered the various requirements for sound equipment, lighting, video displays, and other technical elements, encompassing crowd load, wind load, and other potential environmental factors.

To secure the temporary structures, MJC engineered the required ballast or screw piles. These foundations were indispensable in anchoring the stages securely and withstanding the forces exerted by equipment and environmental conditions.

During the construction and erection of the stage structures, MJC provided on-site engineers to supervise the assembly process, ensuring strict adherence to the approved structural designs and safety standards.

Once the structural assessments and on-site inspections had been completed, MJC provided the festival organisers with sign-off documentation, confirming that the temporary stage structures met all safety requirements in accordance with UK standards.

 

Challenges

This festival presented unique challenges due to its scale and complex stage designs. Ensuring the safety of performers and the audience while accommodating the technical requirements of each stage was paramount. Additionally, the festival’s outdoor setting demanded careful consideration of wind loads and stability.

MJC’s team of seasoned structural engineers rose to these challenges, delivering detailed structural design reviews, thorough load assessments, and innovative foundation solutions. Their on-site engineering support during construction guaranteed precise execution of the designs, ensuring that all safety standards were met. The sign-off documentation provided festival organisers with peace of mind, confirming that the stages complied with UK safety standards.

 

The J2 Festival resonated as a resounding success, with attendees enjoying a diverse range of performances.

Next Case Study

London Heathrow Terminal 2 Starbucks Shop Outfit by MJ Consulting

MJ Consulting (MJC) took the lead in delivering a successful and efficient shop outfit for the Starbucks outlet at London Heathrow Terminal 2.

View Case Study
All Case Studies